TR Construction is working with Project Advocates and Vrana Construction on the renovations to the 24th Street Corridor and Lied Parking Lot at Creighton University.
Creighton University Project
TR is contracted to complete the concrete scope for:
- foundations
- footings
- piers at the monuments
- site stairs
- retaining walls
- feature and donor walls
- site structural concrete
Along with the structural concrete, TR Construction will complete the concrete paving bands, architectural concrete features, and base slabs for the paver drive and walk sections.