TR Construction was contracted for the concrete scope for the Faith Formation Center Addition at the St. John’s Catholic Church in Valley, Nebraska. St John’s Catholic Church – Valley, NE The addition included footings, foundations, and flatwork for a 7,400 SF addition to the Church. Along with the addition, TR Construction completed 34,000 SF of […]
Project Category: Commercial
Fountain Pointe – Norfolk
TR Construction was contracted to perform the concrete package for a new retirement community Fountain Pointe in Norfolk NE. This included footings, poured walls, approx.. 45,000 sq ft of paving and sidewalks and 57,000 sq ft of slab on grade.
Fox Run – Council Bluffs
TR Construction was contracted to perform a concrete package to include Footings, Poured walls, 57,000 sq ft of slab on grade, and approx.. 45,000 sq ft of paving and sidewalks for the Fox Run – Council Bluffs, IA retirement community.
Creighton University
TR Construction is working with Project Advocates and Vrana Construction on the renovations to the 24th Street Corridor and Lied Parking Lot at Creighton University. Creighton University Project TR is contracted to complete the concrete scope for: foundations footings piers at the monuments site stairs retaining walls feature and donor walls site structural concrete Along […]
Trade Winds / Andover Point
TR Construction was contracted to provide the concrete scope of 400,000 sq ft of paving at Trade Winds Andover Apartments located at 132nd and Chandler Road. Trade Winds Andover Point In addition, Tradewinds Apartments located at 210th & Q Street to include 100,000 sq ft of floor slabs and garages, 200,000 sq ft of paving, and […]
Rocket Car Wash – Lincoln
TR Construction has been contracted by Kingery Construction to renovate the long-standing Husker Carwash into a new Rocket Carwash. TR’s scope of work includes foundations and CIP walls for a new conveyor pit within the existing carwash drive-thru bay, point of sales drive-thru foundations, vacuum bay equipment foundations, canopy structure foundations, floor slabs within the […]
Prairie Lane Elementary School
TR Construction has been contracted by Vrana Construction to renovate and build a new 40,000 SF addition to Prairie Lane Elementary for Westside Community Schools. TR’s scope of work includes foundations, CIP stem walls, building floor slabs, concrete paving, and sidewalks. Prairie Lane Elementary School Upon completion, TR will have placed 485 CY of foundation […]
Burke High School Parking Lot
Tr Construction did a large project for Burke High School Parking Lot. This project consisted of approx. 25,000 square feet of removal and replacement of existing parking lot and sidewalks. In addition, TR poured a new parking lot for the football stadium at Burke High School (approx. 125,000 square feet). TR’s Ligchine Lazer Screed was […]
Home 2 Suites & Tru by Hilton
TR Construction is contracted with Dicon Corporation to build a new four-story 80,000 SF dual-brand hotel. Home 2 Suites & Tru by Hilton TR’s scope of work includes building foundations, cast in place walls, building floor slabs, concrete paving, and sidewalks. Upon completion of this project, TR will have placed 475 CY of foundation concrete, […]